What is Right of Way (ROW)




What is Right of Way (ROW): -


Right of Way (ROW)is something that civil engineers work with a lot. It’s on virtually all of the surveys that we use. It’s a key point that must be known if you’re working on a project where private property meets public property. This is especially important when working on transportation projects for local governments. There are a lot of aspects to Right of Way and Right of Way Acquisition. I’m going to talk about it mainly from the transportation side.

What is Right of Way...?

Here’s an example of what Right of Way (ROW) is. A city owns a public street that goes through a residential neighborhood. They also own a few feet past the pavement on both sides of the street. If a residential street is 30-36 feet wide the city may own a total of 46-50+ feet wide area. So, yes they own part of your front yard. Virtually all public streets are like this, from local residential streets on up to interstate highways which may have ROWs that are hundreds of feet wide.

Why Right of Way

The government holds a right of way wider than the actual street for several reasons. They use the extra land for things like public sidewalks, utilities, or to widen the road in the future. Also, street lights, traffic signals and street parking are all in the ROW.

Right of Way is something that we have to know where is, but civil engineers don’t typically worry about why it’s where it is or how to get more. That sort of thing is typically handled by the government agency itself. Or was figured out when the property was first developed. Civil engineers don’t generally get more once an area is already developed.

However, I’ve had the privilege recently to work on a ROW acquisition project recently. That’s a service that our company offers, and my background in roadway design helped get me involved in a roadway ROW project.

The project


Here are the basics of the project. A two lane county road needed to be widened because of all of the development nearby. Plans were drawn up and the road was designed, but the county didn’t actually own enough land to make the road wider. That’s where we came in on the project. The county hired us to acquire the land for them.

What you have to do


There are several steps involved in ROW acquisition. I’m going to go over the broad steps. Perhaps at a later date I’ll write a more detailed article, or ask our resident expert to put one together for me.

Survey

It seems that everything in civil engineering begins with a survey. The same applies here. With the survey and the plans we can see exactly how much land is needed from each land owner. The surveyor provides documents showing exactly how much land is needed. They generally will also mark the area with flags or other markers.

Initial Letter

An initial letter is sent to the current land owner to let them know about the surveyors and appraisers coming onto their property. The letter also lets the owner know what’s going on with the project; the whys, the whos, etc.

Appraisals


Next the appraisers go to work. They appraise each plot of land that the government needs to buy. The appraisers generally will take into account mailboxes, fences, trees and anything else that may be in the proposed right of way area that current land owner would have to move or lose value if it’s removed.

Title Search

Just like when you buy any piece of property, you do a title search to find out who actually owns the land. This will also tell you about any liens on the property such as a mortgage, tax lien or unpaid debt. Any lien will affect the sale.

Offer Letters

Send the initial offer letter. Basically the offer is for what the appraiser valued the land at.

Negotiation

This can be real long or real short depending on what the land owner wants. I’ve seen some just sign the paperwork and send it back. Some think their land is worth more, some will want fences or custom mailboxes replaced, trees paid for, or many other things. Some just flat out refuse to sell. In most cases something can be worked out to the benefit of both the land owner and the municipality.

Partial Release of Lien

We do have to deal with any liens that are on the property. If there is a mortgage, for example, we have to get a partial release of lien. Basically the bank has to give up that part of the land on their deed. Lien holders may have the right to the money first. That varies some by location. Banks sometimes require a percentage of the money based on a percentage of the property sold.

Acceptance or Condemnation


Eventually, after the negotiations, the land owner accepts or they don’t. If they accept, then the paperwork is signed, they get their money and the government gets the land. If they are unwilling to sign, then it goes to condemnation. That means that it goes before a third party to decide the case. Generally when this happens the government gets the land and the land owner gets fair market value for their property. Because of the expense it really doesn’t do anybody any good to go to condemnation. As long as we follow the laws and our engineering ethics guidelines we are fine.

There is a lot more to it, but that covers the basic process. It is certainly a good thing to know, even if you never do ROW acquisition yourself. Having the knowledge gives you a better understanding of the process and what the municipality has to do on some projects. However, having the expertise can give your company another product to offer municipal clients.

Important point to remember for civil engineers useful at site



Following are the important point must to remember for every civil engineer at site

➤Minimum thickness of slab is 125 mm.

➤Water absorption should not be more than 15 %.

➤Dimension tolerance for cubes + – 2 mm.

➤Compressive strength of Bricks is 3.5 N /mm2

➤Maximum Free fall of concrete allowed is 1.50 m.

➤In soil filling as per IS code for every 100 sqm 3 sample for core cutting test should be taken.

➤Electrical conduits shall not run in column

➤Earth work excavation for basement above 3 m should be stepped form.
Any back filling shall be compacted 95% of dry density at the optimum moisture content and in layers not more than 200mm for filling above structure and 300 mm for no structure

➤A set of cube tests shall be carried out for each 30 cum of concrete / each levels of casting / each batch of cement.

➤Water cement ratio for different grades of concrete shall not exceed 0.45 for M20 and above and 0.50 For M10 / M15 contractor

➤For concrete grades M20 and above approved admixture shall be used as per mix design requirements.

➤Cement shall be stored in dry places on a raised platform about 200mm above floor level and 300mm away from walls. Bags to be stacked not more than 10 bags high in such a manner that it is adequately protected from moisture and contamination.

➤Samples from fresh concrete shall be taken and at least a set of 6 cubes of 150mm shall be prepared and cured. 3 Cubes each at 7 days and 28 days shall be tested for compressive strength. The test results should be submitted to engineer for approval. If results are unsatisfactory necessary action/rectification/remedial measures has to be exercised.


➤Water used for both mixing and curing shall be clean and free from injurious amounts of oils, acids, alkalies, salts, sugar and organic materials or other substances that may be deleterious to concrete or steel. The ph shall be generally between 6 and 8.

➤Cement shall be tested for its setting.
1. The initial setting time shall not be less than 30 minutes.
2. The final setting time shall not be more than 10 hours.

➤Slump IS 456 

Lightly reinforced 25 – 75 mm
Heavily reinforced 75 – 100 mm
Trench fill (insitu & Tremie) 100 – 150 mm (For Tremie no need of vibrator)
Curing Days Required
Super Sulphate cement : 7 days
Ordinary Portland cement OPC : 10 days
Minerals and Admixture added cement : 14 days