The
cubic contents of a building means plinth area x height of the
building. The height is taken from top of floor level to top of roof.
The
cubic contents of the proposed building are multiplied with cubic rates
arrived at for the similar construction i.e. total cost of construction
divided by cubic contents = cost per cubic metre.
Documents attached are as in plinth area estimate.
(Administrative approval is granted on rough cost estimate)
0 comments: