After getting Administrative approval on rough cost estimate, detailed estimates are prepared.
In this, the estimate is divided in to sub-heads and quantities of various items are calculated individually.
In
the end of the detailed quantities, an abstract of cost giving
quantities of each item and rate of every item according to the
sanctioned schedule of rates shall be attached. In case of non-schedule
rates i.e. rates which are not given in the sanctioned schedule of
rates, proper analysis of rates shall be attached. If however the work
proposed to be constructed is located in a remote place, the provision
for the carriage of the material shall be added in the estimate to avoid
any excess over the administratively approved estimate later on.
Detailed specifications & report should also be attached with the
estimate. Technical sanction is given on detailed estimate.
The
detailed estimate shall also provide for the cost of approach road,
water supply, electric installations and acquisition of land etc, so as
to call it a comprehensive estimate.